 |
 |
| (Nusa Indah Theatre)
Rp. 75.000.000++
(1 day loading, 1 Showday and GR) Overtime Rp. 4.500.000/hour |
| Facilities |
- Artist dressing room
- Broadcast room
- Pantry
- Loading bay
- Free Parking (5 vehicles)
- Technical support
- Loading Lift
- Workshop
|
- Cleaning service
- Security
- Mechanical/Electrical Engineer
- Main lobby
- 1st floor lobby
- VIP room
- Lockers
- 1 Boutique hotel
|
| Sound System |
- EAW KF-730 (12) 3 way full range line array loudspeaker system
- EAW SB-730 (4) Subwoofer system
- Lab Grupen FB-6400 (3) Power Amplifier
- XTA DP-226 (2) Speaker management 2 input and 6 output
- Mackie SRM 350 (2) 2 way full range (under balcony speaker)
|
| Lighting & Special Effect |
- 3 unit motorized single batten 24 channel: 18m
- 2 unit motorized double batten 36 channel: 18m
- Wiring from batten to dimmer
- 120 channel power pack (lite Puter) @ digital
- 1 unit dimmer controller Avolite 2004 (2048 channel)
|
| Technical Support |
Electricity: 374,365 KVA max. (General Lighting & AC)
Wall Outlet: 400 VA/outlet
Stage Structure: Wood
Wall Structure: Concrete - Cell-Spray - Accoustic Fabric
Chair: 1084 (balcony 378; Ground 706)
|
BALAI KARTINI
Jl. Jend. Gatot Subroto Kav. 37 Jakarta 12950
Telp. +62 (21) 521 3653 Fax. +62 (21) 525 0435
|
 |